[{"bbox": [87, 91, 427, 121], "category": "Section-header", "text": "## 3.6 Logical Framework Matrix"}, {"bbox": [83, 162, 1192, 188], "category": "Text", "text": "At action level, the indicative log frame should have a maximum of 10 expected results (Impact/Outcome(s)/Output(s))."}, {"bbox": [83, 189, 884, 214], "category": "Text", "text": "It constitutes the basis for the monitoring, reporting and evaluation of the intervention."}, {"bbox": [83, 214, 1674, 292], "category": "Text", "text": "On the basis of this log frame matrix, a more detailed log frame (or several) may be developed at contracting stage. In case baselines and targets are not available for the action, they should be informed for each indicator at signature of the contract(s) linked to this AD, or in the first progress report at the latest. New columns may be added to set intermediary targets (milestones) for the Output and Outcome indicators whenever it is relevant."}, {"bbox": [121, 293, 1171, 319], "category": "List-item", "text": "- At inception, the first progress report should include the complete log frame (e.g. including baselines/targets)."}, {"bbox": [121, 320, 1013, 346], "category": "List-item", "text": "- Progress reports should provide an updated log frame with current values for each indicator."}, {"bbox": [121, 347, 1033, 371], "category": "List-item", "text": "- The final report should enclose the log frame with baseline and final values for each indicator."}, {"bbox": [83, 373, 1503, 398], "category": "Text", "text": "The indicative logical framework matrix may evolve during the lifetime of the action depending on the different implementation modalities of this action."}, {"bbox": [83, 399, 1674, 450], "category": "Text", "text": "The activities, the expected Outputs and related indicators, targets and baselines included in the log frame matrix may be updated during the implementation of the action, no amendment being required to the Financing Decision."}, {"bbox": [72, 501, 1688, 1102], "category": "Table", "text": "<table><thead><tr><th>Results</th><th>Results chain (@):<br>Main expected results (maximum 10)</th><th>Indicators (@):<br>(at least one indicator per expected result)</th><th>Baselines<br>(values and years)</th><th>Targets<br>(values and years)</th><th>Sources of<br>data</th><th>Assumptions</th></tr></thead><tbody><tr><td>Impact</td><td>Foster a functioning pluralistic,<br>inclusive, participatory and<br>representative democracy in Nigeria</td><td>1. Voice and Accountability Country<br>score according to the Worldwide<br>Governance Indicator (WGI)<br><br>2. Proportion of EU Electoral<br>Observation Mission recommendations<br>implemented before the 2023 general<br>elections and between 2023 and 2027<br>(next general elections)*<br><br>3. Level of appreciation of the electoral<br>process by EU EOM and other<br>observers' groups</td><td>1. Voice and<br>Accountability Score:<br>34.98<br><br>2. EU EOM and<br>Observers'<br>reports of the<br>2019 general<br>elections<br><br>3. To be determined<br>(TBD) - (2023)<br>when<br>recommendations<br>are<br>communicated<br>following the<br>elections in 2023</td><td>1. 50<br><br>2. 5 by 2023<br><br>3. TBD by<br>2027</td><td>1. World Bank<br>World<br>Governance<br>Indicators<br>(WGI)<br><br>2/3 Observers'<br>reports<br>3. Afro<br>barometer<br>reports</td><td>Not applicable</td></tr><tr><td>Outcome 1</td><td>SO1- Improve the quality of electoral<br>administration in Nigeria</td><td>1.1 **Number of countries supported<br>by the EU to conduct elections and/or</td><td>1.1 EMSC 2019</td><td>1.1 Complete<br>integration of</td><td>1.1 Official<br>results INEC</td><td>INEC,<br>stakeholders</td></tr></tbody></table>"}, {"bbox": [1052, 1108, 1168, 1131], "category": "Page-footer", "text": "Page 18 of 29"}]