[{"bbox": [114, 113, 1613, 965], "category": "Table", "text": "<table><tr><td>Outcome 3</td><td>3. The digital transformation of Mozambique's electricity sector is promoted</td><td>3.1 Number of kms of transmission line retrofitted with optic fibre with EU support<br>3.2 Total Number of Interconnected retrofitted kms of transmission line enabled by the action with EU support</td><td>3.1=0 km (2022)<br>3.2=766 km (2022)</td><td>3.1=719 km (2027)<br>3.2=4202 km (2027)</td><td>3.1 EDM annual report<br>3.2 EDM annual report</td><td></td></tr><tr><td>Output 1<br>related to Outcome 1-3</td><td>1.1 National Control Centre (NCC) building is constructed, fully equipped and operational</td><td>1.1.1 % of the NCC construction with EU support<br>1.1.2 % of NCC equipment with EU support</td><td>1.1.1=0 (2022)<br>1.1.2=0 (2022)</td><td>1.1.1=100 (2027)<br>1.1.2=100 (2027)</td><td>1.1.1 EDM, KfW reports,<br>1.1.2 EDM, KfW reports,</td><td>Project Implementation Unit (PIU) put in place</td></tr><tr><td>Output 2<br>related to Outcome 1-3</td><td>1.2 Backup NCC and 2 regional control centres are constructed, fully equipped and operational</td><td>1.2.1 % of backup NCC and regional CC's construction with EU support<br>1.2.2 % of backup NCC and regional CC's equipment with EU support</td><td>1.2.1=0 (2022)<br>1.2.2=0 (2022)</td><td>1.2.1=100 (2027)<br>1.2.2=100 (2027)</td><td>1.2.1 EDM, KfW reports<br>1.2.2 EDM, KfW reports,</td><td>Mozambique Integrated Transmission Backbone System (STE Project) completed</td></tr><tr><td>Output 3<br>related to Outcome 1-3</td><td>1.3 Adaptation works for substations and telecommunication infrastructure are completed</td><td>1.3.1 Number of updated substation with EU support<br>1.3.2 Number of newly connected substations based on modernised telecommunication infrastructure with EU support</td><td>1.3.1=0 (2022)<br>1.3.2=0 (2022)</td><td>1.3.1=70 (2027)<br>1.3.2=135 (2027)</td><td>1.3.1 EDM, KfW reports,<br>1.3.2 EDM, KfW reports</td><td>Additional interconnection with neighbouring countries completed</td></tr><tr><td>Output 4<br>related to Outcome 1-3</td><td>1.4 EDM fully capable and equipped to control and monitor the power network.</td><td>1.4.1 Number of EDM staff trained with increased knowledge and/or skills in energy information system management with EU support, disaggregated by sex</td><td>1.4.1=0 (2022)</td><td>1.4.1=50 (2027)</td><td>1.4.1 EDM, KfW reports</td><td></td></tr></table>"}, {"bbox": [1494, 1150, 1613, 1173], "category": "Page-footer", "text": "Page 17 of 25"}]