[{"bbox": [134, 153, 1133, 207], "category": "List-item", "text": "- Refurbishment of the building in Maputo currently hosting the Control Centre South to host the future Backup Control Centre and its equipment, among others, with a SCADA/EMS system;"}, {"bbox": [134, 207, 1133, 260], "category": "List-item", "text": "- Construction of a building in Chibata (Centre) to host the Medium Voltage Feeders Control Centre (MVFCC) for the Central region and its equipment, among others, with a SCADA/EMS system;"}, {"bbox": [134, 260, 1133, 314], "category": "List-item", "text": "- Construction of a building in Nampula (North) to host the Medium Voltage Feeders Control Centres (MVFCC) for the Northern region and its equipment, among others, with a SCADA/EMS system;"}, {"bbox": [97, 340, 372, 366], "category": "Text", "text": "Activities related to Output 3:"}, {"bbox": [134, 367, 1133, 420], "category": "List-item", "text": "- Substation adaptation measures to enable them to communicate automatically with the control centres, e.g. installation of Remote Terminal Units (RTU);"}, {"bbox": [134, 420, 1133, 473], "category": "List-item", "text": "- Installation of telecommunication infrastructure, using optical fibres (including retrofitting existing transmission lines with optic fibre cables) and wireless solutions;"}, {"bbox": [97, 500, 372, 526], "category": "Text", "text": "Activities related to Output 4:"}, {"bbox": [134, 526, 788, 552], "category": "List-item", "text": "- Training and exchange visits with special attention to train women;"}, {"bbox": [134, 552, 1133, 633], "category": "List-item", "text": "- Service and maintenance agreement between Electricidade de Moçambique (EDM) and the contractor in charge of the telecommunication installation. The purpose is to have the system operating over time and the software updated as needed to follow the evolution of the technology."}, {"bbox": [97, 660, 413, 686], "category": "Text", "text": "Activities related to Output 1 to 4:"}, {"bbox": [134, 686, 1133, 740], "category": "List-item", "text": "- Supervision of all works and equipment activities for the development of the NCC with a human rights and gender based approach"}, {"bbox": [97, 765, 1133, 922], "category": "Text", "text": "The National Control Centre, together with the Backup Control Centre, will serve to monitor and control the high-voltage grid (66 kV and above). The two new regional Control Centres, together with the current Control Centre for the southern grid, will serve to monitor and control the medium-voltage grid. The system, including back-up and regional control centres, is organised to allow alternative routes and redundancy in case of loss of telecommunication. This will serve to provide maximum availability of the system and avoid any failure in the control."}, {"bbox": [97, 950, 1133, 1005], "category": "Text", "text": "Electricidade de Moçambique (EDM) will act as the Project Executing Agency (PEA) and will implement all the activities with the support of the supervising engineer."}, {"bbox": [97, 1030, 1133, 1084], "category": "Text", "text": "The EU contribution, in joint co-financing with the German Government (KfW), will fund the following components:"}, {"bbox": [134, 1084, 1133, 1137], "category": "List-item", "text": "- The acquisition and installation of the SCADA/EMS systems for the new NCC, the Backup Control Centre and two new regional Medium Voltage Feeders Control Centres (MVFCC) – Part of Outputs 1 and 2"}, {"bbox": [134, 1137, 993, 1164], "category": "List-item", "text": "- The equipment and installation for all the substation adaption measures – Part of Output 3"}, {"bbox": [134, 1164, 1052, 1191], "category": "List-item", "text": "- The upgrading of the EDM telecommunications infrastructure where required – Part of Output 3"}, {"bbox": [134, 1191, 620, 1218], "category": "List-item", "text": "- The required training of EDM – Part of Output 4"}, {"bbox": [97, 1231, 1120, 1344], "category": "Text", "text": "The other funders will cover the cost of the new buildings for the NCC and two regional control centres as well as specific new telecommunications infrastructure such as retrofitting of optic fibre on existing transmission lines plus any related telecommunications adaption works. The engineering consulting fees will also be covered by the other partners."}, {"bbox": [97, 1357, 1089, 1409], "category": "Text", "text": "A fine-tuning of the activities may be proposed to ensure the timely achievement of outputs and outcomes as defined in this action."}, {"bbox": [97, 1425, 1133, 1532], "category": "Text", "text": "The commitment of the EU's contribution to the Team Europe Initiative foreseen under this action plan will be complemented by other contributions from Team Europe partners. It is subject to the formal confirmation of each respective partners' meaningful contribution as early as possible. In the event that the TEIs and/or these contributions do not materialise the EU action may continue outside a TEI framework."}, {"bbox": [1037, 1680, 1143, 1706], "category": "Page-footer", "text": "Page 9 of 25"}]