[{"bbox": [115, 100, 476, 130], "category": "Section-header", "text": "## 3.6 Logical Framework Matrix"}, {"bbox": [115, 145, 1464, 173], "category": "Section-header", "text": "### Title: Support for sustainable economic development through demand-driven Technical and Vocational Education and Training (TVET)"}, {"bbox": [115, 217, 1129, 243], "category": "Text", "text": "This indicative logframe constitutes the basis for the monitoring, reporting and evaluation of the intervention."}, {"bbox": [115, 244, 1611, 321], "category": "Text", "text": "On the basis of this logframe matrix, a more detailed logframe (or several) may be developed at contracting stage. In case baselines and targets are not available for the action, they should be informed for each indicator at signature of the contract(s) linked to this AD, or in the first progress report at the latest. New columns may be added to set intermediary targets (milestones) for the Output and Outcome indicators whenever it is relevant."}, {"bbox": [153, 322, 1198, 347], "category": "List-item", "text": "- At inception, the first progress report should include the complete logframe (e.g. including baselines/targets)."}, {"bbox": [153, 349, 1038, 374], "category": "List-item", "text": "- Progress reports should provide an updated logframe with current values for each indicator."}, {"bbox": [153, 376, 1057, 401], "category": "List-item", "text": "- The final report should enclose the logframe with baseline and final values for each indicator."}, {"bbox": [115, 402, 1536, 427], "category": "Text", "text": "The indicative logical framework matrix may evolve during the lifetime of the action depending on the different implementation modalities of this action."}, {"bbox": [115, 428, 1582, 480], "category": "Text", "text": "The activities, the expected Outputs and related indicators, targets and baselines included in the logframe matrix may be updated during the implementation of the action, no amendment being required to the Financing Decision."}, {"bbox": [104, 538, 1633, 1043], "category": "Table", "text": "<table><thead><tr><td>Results</td><td>Main expected results</td><td>Indicators</td><td>Baselines (values and years)</td><td>Targets (values and years)</td><td>Sources of data</td><td>Assumptions</td></tr></thead><tbody><tr><td>Impact</td><td>To develop human capital to meet the private sector needs.</td><td>1. GDP growth rate<br>2. Percentage of individuals who found a job or are self-employed within 6 months after having received support from the EU-funded intervention, disaggregated by sex, age, disability, migrant status (OPSYS core indicator)<br>3. Percentage of employed/ self-employed graduates (disaggregated by</td><td>1. GDP growth rate 5.5% (2021)<br>2. Est. 64% graduate employment (including 44% self-employment) from ongoing support (TVET III)<br>3. TBD at inception phase</td><td>1. GDP growth rate 7% (2023)<br>2. At least 75%<br>3. TBD at inception phase<sup>7</sup></td><td>1. Pakistan Economic Survey<br>2. NSIS<br>3. NVQF Registry<br>4. Tracer study reports</td><td></td></tr></tbody></table>"}, {"bbox": [115, 1093, 456, 1117], "category": "Footnote", "text": "⁷ Current min. wage 20,000 PKR (TBC)"}, {"bbox": [1495, 1150, 1613, 1173], "category": "Page-footer", "text": "Page 17 of 28"}]