[{"bbox": [71, 99, 1600, 1129], "category": "Table", "text": "<table><tr><td>1.1.3 Number of public officials who received capacity building activities in project management, monitoring and evaluation (disaggregated by sex)</td><td>to be determined in 2023</td></tr><tr><td>1.1.4 Power system studies to identify equipment needed to build a dispatch/control room capable of managing variable renewable energy injected into the national grid are undertaken</td><td></td></tr><tr><td>1.1.5 Training Needs Assessment (TNA) undertaken and number of BPC officials capacitated to carry out daily activities in the new dispatching/control room</td><td></td></tr><tr><td>1.1.6 Capacity building activities for BPC officials and Technical Assistance to</td><td></td></tr></table>"}, {"bbox": [1568, 1134, 1690, 1158], "category": "Page-footer", "text": "Page 19 of 34"}]