[{"bbox": [125, 126, 1077, 1617], "category": "Table", "text": "<table><tr><td>rubber) reducing potential investment; limited foreign exchange resources.</td><td></td><td>Access to electricity would open the potential of the development of high value agricultural goods value chains.</td></tr><tr><td><strong>Public policy</strong><br/>Due to high aid dependency a potential reduction of aid could influence the delivery of public policies.</td><td>M</td><td>New policy support instrument (PSI) programme with IMF focuses on improvement of tax collection and tax administration.</td></tr><tr><td><strong>Natural resources that will be used for producing energy</strong><br/>Non-renewable (fossil) energies may be used in this project.</td><td>L</td><td>All sites in the S-E, except Greenville and Barclayville, are or will be on-grid with Côte d'Ivoire and the nearest generation from which the power will come in principle is the Man Hydro Power Plant. The Ivorian grid is nevertheless part of the WAPP interconnected grid for which it is not possible to determine the source of generation beyond an overall average (http://www.ecowapp.org/).<br/>The Greenville project foresees generation coming from a local Small Hydro Power Plant with small solar power plant option for the start-up phase. EU will ensure that preference will be given to the environmentally best option in the tendering process - if the necessary funds will be available under the upcoming Financing Decision.<br/>Barclayville foresees solar home systems.</td></tr><tr><td><strong>Human Resources</strong><br/>MME, LEC and RREA have limited institutional and human resource capacities.</td><td>M</td><td>The Supervisor and Technical Auditors for the works with adequate budget, will be contracted under the programme.<br/>The action shall strengthen their project management capacities of the sector and shall keep adequate qualified personnel, including for the monitoring of the project.<br/>The Delegation commits to a high level of engagement in technical assistance, monitoring, advice, and project steering.</td></tr><tr><td><strong>Coordination of the Donors' intervention</strong><br/>Potential future risk of lack of coordination between the donors' interventions in the energy sector and limited communication between LEC and the donors' community.</td><td>M</td><td>Continuation of the Donors' energy dialogue, which has already seen a significant leap in quality by the formation of the Rural Energy Working Group (REWG) 22/09/2017. EU is part of the REWG Steering Committee.<br/>All members of the Steering Committee continue their pro-active participation through monthly meetings.</td></tr><tr><td><strong>Corruption and Fraud</strong><br/>Perceived level of corruption.</td><td>M</td><td>Government continues on determined action against corruption. The EU Delegation supports the Government of Liberia in fighting corruption on several levels: corruption cases of major relevance or in the area of Public Financial Management are discussed within the framework of the policy dialogue of the budget support operation. In addition, the State Building Contract has one specific condition to increase the approval and publication of spending entities' procurement</td></tr></table>"}, {"bbox": [607, 1676, 620, 1696], "category": "Page-footer", "text": "8"}]