[{"bbox": [129, 153, 639, 192], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [129, 216, 1146, 296], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [129, 309, 1146, 364], "category": "Text", "text": "* Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance;"}, {"bbox": [129, 375, 1146, 429], "category": "Text", "text": "* Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations);"}, {"bbox": [129, 440, 940, 468], "category": "Text", "text": "* Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [129, 479, 1146, 534], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [129, 545, 1146, 598], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [129, 610, 431, 638], "category": "Text", "text": "The present Action identifies as:"}, {"bbox": [129, 647, 1142, 754], "category": "Table", "text": "<table><thead><tr><th colspan=\"3\">Action level</th></tr></thead><tbody><tr><td>☒</td><td>Single action</td><td>Present action: all contracts in the present action</td></tr></tbody></table>"}, {"bbox": [1026, 1680, 1142, 1705], "category": "Page-footer", "text": "Page 24 of 24"}]