[{"bbox": [129, 153, 639, 192], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [129, 217, 1128, 310], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [129, 351, 1106, 413], "category": "Text", "text": "* Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance;"}, {"bbox": [129, 417, 1034, 479], "category": "Text", "text": "* Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations);"}, {"bbox": [129, 483, 1013, 514], "category": "Text", "text": "* Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [129, 554, 1076, 616], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [129, 621, 1034, 680], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [129, 723, 1075, 754], "category": "Text", "text": "The intervention level for the present Action identifies as (tick one of the 4 following options):"}, {"bbox": [129, 792, 1140, 898], "category": "Table", "text": "<table><thead><tr><th colspan=\"3\">Action level (i.e. Budget Support, blending)</th></tr></thead><tbody><tr><td>☒</td><td>Single action</td><td>Present action: all contracts in the present action</td></tr></tbody></table>"}, {"bbox": [1118, 1653, 1143, 1677], "category": "Page-footer", "text": "24"}]