[{"bbox": [71, 98, 1712, 1117], "category": "Table", "text": "<table><thead><tr><th></th><th></th><th></th><th></th><th></th><th></th><th></th></tr></thead><tbody><tr><td>Output 2<br>relating to Outcome 2</td><td>2.2. Improved watershed and land planning capacities of MoWE, BCO, DBOs and communities</td><td>2.2.1. 2 draft watershed development and rehabilitation plans supported</td><td>2.2.21.0 by 2022</td><td>2.2.21.TBD in inception</td><td>2.2.21.Draft plans and minutes of discussion</td><td>The plans are further maintained, used and funded / implemented</td></tr><tr><td></td><td></td><td>2.2.2. Number of draft land management plans</td><td>2.2.2.0 by 2022</td><td>2.2.2. TBD in inception</td><td>2.2.2. Draft plans and minutes of discussion</td><td>Same as above</td></tr><tr><td></td><td></td><td>2.2.3. Number of MoWE, BCO, DBOs representatives trained and knowledgeable on protection and conservation of land and water resources, disaggregated by sex, institution and location</td><td>2.2.3.0 by 2022</td><td>2.2.3. TBD in inception</td><td>2.2.3. Pre- and post-assessments; sign-in lists</td><td>The trained staff stay at their job</td></tr><tr><td>Output 3 relating to Outcome 2</td><td>2.3. Improved resilience capacity of economic actors depending on water energy</td><td>2.3.1. Number of economic actors participating in solar-based mini-grid installed</td><td>2.3.1.0 by 2022</td><td>2.3.1. TBD in inception</td><td></td><td>Lessons and good practices are collected and disseminated</td></tr><tr><td></td><td></td><td>2.3.2. Status of a financing facility for economic actors participating in solar mini-grid</td><td>2.3.2.0 by 2022</td><td>2.3.2. TBD in inception</td><td></td><td>Acces to existing financial facilities</td></tr><tr><td>Output 1<br>relating to Outcome 3</td><td>3.1. Improved capacities of regional and Woreda administration Disaster Risk Management (DRM) institutions in efficient early warning systems (EWS) and management enhanced.</td><td>3.1.1 Number of woredas with draft development plans</td><td>3.1.1.0 by 2022</td><td>3.1.1. TBD in inception</td><td>3.1.1. Draft development plans and minutes of discussion with woredas</td><td>The plans and profiles are further maintained, used and funded / implemented at all levels</td></tr><tr><td></td><td></td><td>3.1.2 Number of staff from local authorities benefitting from capacity building for strengthening the early warning system, disaggregated by sex, institution and location</td><td>3.1.2.0 by 2022</td><td>3.1.2. TBD in inception</td><td>3.1.2. Pre- and post-assessment; sign in lists</td><td>The trained staff stay at their job</td></tr><tr><td></td><td></td><td>3.1.3 Number of woreda risk profiles and DRM plans developed</td><td>3.1.3.0 by 2022</td><td>3.1.3. TBD in inception</td><td>3.1.3. Draft plans and discussion</td><td></td></tr></tbody></table>"}, {"bbox": [1567, 1134, 1691, 1158], "category": "Page-footer", "text": "Page 20 of 27"}]