[{"bbox": [85, 120, 591, 158], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [85, 185, 1125, 267], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [85, 308, 1122, 364], "category": "Text", "text": "- Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance;"}, {"bbox": [85, 369, 1103, 425], "category": "Text", "text": "- Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations);"}, {"bbox": [85, 431, 893, 458], "category": "Text", "text": "- Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [85, 496, 1086, 552], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [85, 558, 1116, 611], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [85, 651, 950, 679], "category": "Text", "text": "The intervention level for the present Action identifies as (tick one of the 4 following options):"}, {"bbox": [85, 683, 1140, 789], "category": "Table", "text": "<table><thead><tr><th colspan=\"3\">Action level</th></tr></thead><tbody><tr><td>☑</td><td>Single action</td><td>Present action: all contracts in the present action</td></tr></tbody></table>"}, {"bbox": [1026, 1680, 1142, 1704], "category": "Page-footer", "text": "Page 28 of 28"}]