[{"bbox": [144, 151, 654, 190], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [144, 202, 1087, 289], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [144, 325, 1087, 383], "category": "Text", "text": "- Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance;"}, {"bbox": [144, 387, 1087, 444], "category": "Text", "text": "- Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations);"}, {"bbox": [144, 448, 956, 476], "category": "Text", "text": "- Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [144, 513, 1087, 571], "category": "Text", "text": "Primary Interventions are identified during the design of each Action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [144, 576, 1087, 630], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the Action Document."}, {"bbox": [144, 669, 671, 697], "category": "Text", "text": "The intervention level for the present Action identifies as"}, {"bbox": [155, 701, 1082, 806], "category": "Table", "text": "<table><thead><tr><th colspan=\"3\">Action level (i.e. Budget Support, blending)</th></tr></thead><tbody><tr><td>☑</td><td>Single Action</td><td>Present Action: all contracts in the present Action</td></tr></tbody></table>"}, {"bbox": [968, 1666, 1083, 1692], "category": "Page-footer", "text": "Page 25 of 25"}]