[{"bbox": [97, 146, 1114, 201], "category": "Text", "text": "4.4.2.2 A part of this action may be implemented in indirect management with an entity, which will be selected by the Commission's services using the following criteria:"}, {"bbox": [135, 226, 1132, 280], "category": "List-item", "text": "a) will be Experience and leadership in the field of the Education Management Information System (EMIS) and support to the sector policies and monitoring in strong collaboration with the government"}, {"bbox": [135, 280, 1132, 333], "category": "List-item", "text": "b) Operational capacity on the ground (in Cambodia) and expertise on data management available in capacity-building to the MoEYS"}, {"bbox": [135, 333, 763, 360], "category": "List-item", "text": "c) Strong alignment and ownership with the Government priorities."}, {"bbox": [135, 360, 1029, 387], "category": "List-item", "text": "d) Ability to promote linkages and oversight with other funding in the same areas (e.g. the GPE)"}, {"bbox": [172, 411, 1132, 519], "category": "Text", "text": "This implementation entails the attainment of the following Induced Output (IO) under the Specific Objective 2 of the Programme: **IO 2.1 Increased availability of quality (HRBA- internet connectivity and climate-change sensitive) data for evidence-based policy making including climate-change adaptation of the education system**"}, {"bbox": [97, 557, 636, 585], "category": "Text", "text": "It will also contribute to the following direct outputs (DO):"}, {"bbox": [172, 596, 952, 624], "category": "Text", "text": "- DO 2 Policy dialogue: A more aligned and coordinated policy dialogue is promoted"}, {"bbox": [172, 624, 896, 650], "category": "Text", "text": "- DO 3 Performance assessment: Improved monitoring and reporting of reforms"}, {"bbox": [172, 650, 1126, 730], "category": "Text", "text": "- DO4 Capacity development: Strengthened capacities in the Government of Cambodia conducive to the implementation of the Education policies and the MoEYS PFM Ministerial Action Plans effectively integrating gender mainstreaming and climate change mitigation and adaptation strategies."}, {"bbox": [97, 755, 1114, 809], "category": "Text", "text": "4.4.2.3 A part of this action may be implemented in indirect management with an entity, which will be selected by the Commission’s services using the following criteria:"}, {"bbox": [135, 834, 1132, 888], "category": "List-item", "text": "a) Experience and leadership in the field of non-formal education in strong collaboration with the government and the private sector"}, {"bbox": [135, 888, 1132, 942], "category": "List-item", "text": "b) Operational capacity on the ground (in Cambodia) on adult literacy and gender empowerment in the garment sector"}, {"bbox": [135, 942, 763, 968], "category": "List-item", "text": "c) Strong alignment and ownership with the Government priorities."}, {"bbox": [135, 968, 1023, 994], "category": "List-item", "text": "d) Ability to promote linkages between non formal education, gender and skills for decent work"}, {"bbox": [97, 1020, 1117, 1101], "category": "Text", "text": "This implementation entails the attainment of the following Induced Output (IO) under the Specific Objective 1 of the Programme: **IO 1.5 Factory Literacy and skills for decent work for female garment workers strengthened.**"}, {"bbox": [97, 1138, 636, 1166], "category": "Text", "text": "It will also contribute to the following direct outputs (DO):"}, {"bbox": [172, 1177, 952, 1205], "category": "Text", "text": "- DO 2 Policy dialogue: A more aligned and coordinated policy dialogue is promoted"}, {"bbox": [172, 1205, 896, 1232], "category": "Text", "text": "- DO 3 Performance assessment: Improved monitoring and reporting of reforms"}, {"bbox": [172, 1232, 1126, 1312], "category": "Text", "text": "- DO4 Capacity development: Strengthened capacities in the Government of Cambodia conducive to the implementation of the Education policies and the MoEYS PFM Ministerial Action Plans effectively integrating gender mainstreaming and climate change mitigation and adaptation strategies."}, {"bbox": [85, 1350, 1130, 1406], "category": "Text", "text": "4.4.3 Changes from indirect to direct management mode (and vice versa) due to exceptional circumstances (one alternative second option)"}, {"bbox": [97, 1421, 1132, 1552], "category": "Text", "text": "In case due to circumstances outside of the Commission's control, the implementation modality needs to be changed from indirect to direct management mode (through procurement for a maximum amount of EUR 6.3 million) and, within direct management, from grant to procurement (for a maximum amount of EUR 2.5 million), part of the action, corresponding to: IO 1.2, IO 1.3, and IO 1.4; IO 1.5; 2.1; IO 2.2 could be implemented as follows:"}, {"bbox": [97, 1579, 1132, 1634], "category": "Text", "text": "**Alternative to 4.4.2.1 (from indirect management to an entrusted entity to direct management (procurement))**"}, {"bbox": [1027, 1681, 1143, 1706], "category": "Page-footer", "text": "Page 29 of 34"}]