[{"bbox": [176, 100, 522, 130], "category": "Section-header", "text": "## 3.6 Logical Framework Matrix"}, {"bbox": [126, 147, 1139, 173], "category": "Text", "text": "This indicative logframe constitutes the basis for the monitoring, reporting and evaluation of the intervention."}, {"bbox": [126, 173, 1718, 251], "category": "Text", "text": "On the basis of this logframe matrix, a more detailed logframe (or several) may be developed at contracting stage. In case baselines and targets are not available for the action, they should be informed for each indicator at signature of the contract(s) linked to this AD, or in the first progress report at the latest. New columns may be added to set intermediary targets (milestones) for the Output and Outcome indicators whenever it is relevant."}, {"bbox": [164, 252, 1211, 278], "category": "List-item", "text": "- At inception, the first progress report should include the complete logframe (e.g. including baselines/targets)."}, {"bbox": [164, 279, 1048, 304], "category": "List-item", "text": "- Progress reports should provide an updated logframe with current values for each indicator."}, {"bbox": [164, 305, 1069, 330], "category": "List-item", "text": "- The final report should enclose the logframe with baseline and final values for each indicator."}, {"bbox": [126, 331, 1549, 356], "category": "Text", "text": "The indicative logical framework matrix may evolve during the lifetime of the action depending on the different implementation modalities of this action."}, {"bbox": [126, 357, 1725, 409], "category": "Text", "text": "The activities, the expected Outputs and related indicators, targets and baselines included in the logframe matrix may be updated during the implementation of the action, no amendment being required to the Financing Decision."}, {"bbox": [115, 407, 1732, 1131], "category": "Table", "text": "<table><thead><tr><th>Results</th><th>Results chain (@):<br>Main expected results (maximum 10)</th><th>Indicators (@):<br>(at least one indicator per expected result)</th><th>Baselines<br>(values and<br>years)</th><th>Targets<br>(values and<br>years)</th><th>Sources<br>of data</th><th>Assumptions</th></tr></thead><tbody><tr><td rowspan=\"5\">Impact</td><td rowspan=\"5\">To support Kenya to advance towards climate neutrality, conservation of biodiversity, reduced pollution, resilience, and sustainable economic growth</td><td>GERF 2.7 Greenhouse Gas (GHG) emissions avoided (tonnes CO2eq/year) with EU support</td><td>0 (2023)</td><td>160.000<br>(2030)</td><td>Project<br>Report</td><td rowspan=\"5\"></td></tr><tr><td>Number of indirect jobs supported</td><td>0 (2023)</td><td>12.000<br>(2030)</td><td>Final<br>evaluation</td></tr><tr><td>Renewable energy share in the total final energy consumption (%) (GERF 1.3)</td><td>68 (2019)</td><td>tbd (2030)</td><td>EPRA<br>Report</td></tr><tr><td>Number of people / communities benefiting from increased resilience to various types of risks and shocks, including climate-related ones, as a result of EU-support, disaggregated by sex</td><td>0 (2023)</td><td>tbd (2030)</td><td>Project<br>report</td></tr><tr><td>Unemployment rate, by sex, age and persons with disabilities (GERF 1.11)</td><td>5.6%<br>Females:<br>5.9% (2021)</td><td>tbd (2030)</td><td>WB Data</td></tr><tr><td rowspan=\"2\">Outcome 1</td><td rowspan=\"2\">The electricity system is more resilient and green</td><td>1.1: Additional electricity production from renewable sources (GWh/year)</td><td>1.1: 0 (2023)</td><td>1.1: tbd<br>(2030)</td><td>Targeted<br>study</td><td rowspan=\"2\">GoK remains committed to investing and fully transitioning towards green energy</td></tr><tr><td>1.2: Frequency of power outages (SAIFI Index)</td><td>1.2: 38,18<br>(2022)</td><td>1.2: 28<br>(2030)</td><td>EPRA<br>Report</td></tr></tbody></table>"}, {"bbox": [1493, 1150, 1613, 1173], "category": "Page-footer", "text": "Page 17 of 26"}]