[{"bbox": [72, 103, 431, 134], "category": "Section-header", "text": "## 3.6 Logical Framework Matrix"}, {"bbox": [83, 150, 1094, 176], "category": "Text", "text": "This indicative logframe constitutes the basis for the monitoring, reporting and evaluation of the intervention."}, {"bbox": [83, 176, 1668, 254], "category": "Text", "text": "On the basis of this logframe matrix, a more detailed logframe (or several) may be developed at contracting stage. In case baselines and targets are not available for the action, they should be informed for each indicator at signature of the contract(s) linked to this AD, or in the first progress report at the latest. New columns may be added to set intermediary targets (milestones) for the Output and Outcome indicators whenever it is relevant."}, {"bbox": [121, 255, 1165, 281], "category": "List-item", "text": "- At inception, the first progress report should include the complete logframe (e.g. including baselines/targets)."}, {"bbox": [121, 282, 1007, 308], "category": "List-item", "text": "- Progress reports should provide an updated logframe with current values for each indicator."}, {"bbox": [121, 308, 1027, 333], "category": "List-item", "text": "- The final report should enclose the logframe with baseline and final values for each indicator."}, {"bbox": [83, 334, 1504, 360], "category": "Text", "text": "The indicative logical framework matrix may evolve during the lifetime of the action depending on the different implementation modalities of this action."}, {"bbox": [83, 360, 1649, 412], "category": "Text", "text": "The activities, the expected Outputs and related indicators, targets and baselines included in the logframe matrix may be updated during the implementation of the action, no amendment being required to the Financing Decision."}, {"bbox": [72, 500, 1687, 1111], "category": "Table", "text": "<table><thead><tr><th>Results</th><th>Results chain:<br>Main expected results (maximum 10)</th><th>Indicators:<br>(at least one indicator per expected result)</th><th>Baselines<br>(values and years)</th><th>Targets<br>(values and years)</th><th>Sources of data</th><th>Assumptions</th></tr></thead><tbody><tr><td rowspan=\"4\">Impact</td><td rowspan=\"4\">To contribute to post-2022 floods climate resilient socioeconomic recovery in the most affected and poorest districts of Khyber Pakhtunkhwa province based on 'building back better'</td><td>1. SDG 7.1.1 Proportion of population with access to electricity (GERF 1.2) (disaggregated by sex)</td><td rowspan=\"4\">1</td><td rowspan=\"4\">1</td><td rowspan=\"4\">1</td><td rowspan=\"4\">Not applicable</td></tr><tr><td>2. SDG 7.2.1 Renewable energy share in the total final energy consumption (GERF 1.3)</td></tr><tr><td>3. SDG 1.1.1 Proportion of population below the international poverty line (GERF 1.23) (disaggregated by sex)</td></tr><tr><td>4. SDG 2.3.2 Average income of small-scale food producers, by sex (GERF 1.1)</td></tr><tr><td rowspan=\"3\">Outcome 1</td><td rowspan=\"3\">1) Restore, expand, and strengthen in a climate resilient and environmentally sustainable manner the provision of renewable energy and water for irrigation in rural communities in mountainous areas in KP through a</td><td rowspan=\"3\">1.1. Number of HHs with access to electricity with EU support through: (a) new access, (b) improved access (GERF 2.3) (disaggregated by sex)</td><td>1.1</td><td>1.1</td><td>1.1</td><td rowspan=\"3\">Macroeconomic situation in Pakistan remains stable</td></tr><tr><td>1.2</td><td>1.2</td><td>1.2</td></tr><tr><td>1.3</td><td>1.3</td><td>1.3</td></tr></tbody></table>"}, {"bbox": [1568, 1134, 1689, 1158], "category": "Page-footer", "text": "Page 16 of 24"}]