[{"bbox": [54, 94, 1613, 1078], "category": "Table", "text": "<table><tr><td></td><td>enhanced public sanitation and resilience<br>2. An integrated water governance (gender responsive and disability inclusion) has been developed for sustainable conservation of vital ecosystems and biodiversity</td><td>2.1. Status of the Integrated Water Resources Management (Master) Plan, including gender responsiveness and if possible disability inclusion)<br>2.2. Wastewater System Cost-Recovery Plan and Schedule (as a IWRMP chapter and appendices) to assess revenue generation options so as to cover operations costs, first phase, and capital investments, second phase</td><td>2.1. 2023: Consultancy (draft) study and advisory work completed<br>2.2 2025: Cost Recovery Plan and Schedule, first draft reviewed</td><td>2.1. 2027: First draft of the Integrated Water Resources Management Plan ready and discussed and reviewed by the Council<br>2.2. 2027: Cost Recovery Plan and Schedule, final, disseminated and presented to Bonaire stakeholders</td><td>2.1.Draft IWRMP and its discussion minutes, review report; NEPP Implementation Progress Reports, Public Entity Bonaire<br>2.2 Draft Cost Recovery Plan and Schedule; NEPP Implementation Progress Reports</td></tr><tr><td>Induced Outputs</td><td>1.1. Increased processing of wastewater according to regulatory norms of the Caribbean Netherlands</td><td>1.1.1. Number of people with access to sanitation facility with EU support (**GERF 2.38), disaggregated by sex and location<br>1.1.2. Number of people reached with the EU visibility plaques as per 2022 guidance document and knowledgeable on the gender responsive water governance reform<sup>43</sup><br>1.1.3. Wastewater treatment capacity (in m<sup>3</sup>/day)*</td><td>1.1.1. 2021: 6200 pe<sup>42</sup> (annual average) connected to WWTP service area<br>1.1.2. 2023: 0<br>1.1.3. 2023: existing capacity at 1386 m<sup>3</sup>/day</td><td>1.1.1. 2027: 7200 of which 1000 new pe connected to the central (WWTP service area) or decentral systems, annual average<br>1.1.2. 2027: To be determined by 2025<br>1.1.3. 2027: Upgraded the capacity at 2086 m<sup>3</sup></td><td>1.1.1.NEPP implementation progress reports, WEB<br>1.1.2. Baseline and final surveys Disbursement files<br>1.1.3. Public Entity Bonaire, Directorate Spatial Organisation (DRO), WEB,</td></tr></table>"}, {"bbox": [115, 1109, 982, 1134], "category": "Footnote", "text": "42 Pe' is the population equivalent; numbers are based on annual average for a specific defined period."}, {"bbox": [115, 1133, 1490, 1158], "category": "Footnote", "text": "43 https://international-partnerships.ec.europa.eu/system/files/2023-04/communicating-and-raising-eu-visibility-guidance-for-external-actions-july-2022_en_0.pdf"}, {"bbox": [1494, 1175, 1613, 1199], "category": "Page-footer", "text": "Page 17 of 25"}]