[{"bbox": [129, 153, 639, 192], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [129, 217, 1120, 300], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [129, 307, 1101, 364], "category": "Text", "text": "* Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance;"}, {"bbox": [129, 369, 1081, 425], "category": "Text", "text": "* Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations);"}, {"bbox": [129, 430, 940, 459], "category": "Text", "text": "* Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [129, 463, 1136, 520], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [129, 524, 1129, 579], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [129, 586, 656, 613], "category": "Text", "text": "The intervention level for the present Action identifies as"}, {"bbox": [129, 616, 1140, 722], "category": "Table", "text": "<table><thead><tr><th colspan=\"3\">Contract level</th></tr></thead><tbody><tr><td>☒</td><td>Single contract</td><td>Contribution Agreement with pillar assessed entity(ies)</td></tr></tbody></table>"}, {"bbox": [1026, 1680, 1142, 1705], "category": "Page-footer", "text": "Page 27 of 27"}]