[{"bbox": [129, 153, 636, 191], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [129, 205, 1142, 284], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention allows for:"}, {"bbox": [129, 290, 1142, 344], "category": "Text", "text": "- Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance;"}, {"bbox": [129, 347, 1142, 401], "category": "Text", "text": "- Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations);"}, {"bbox": [129, 405, 936, 432], "category": "Text", "text": "- Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [129, 465, 1142, 519], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [129, 522, 1142, 575], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [129, 611, 993, 638], "category": "Text", "text": "The intervention level for the present Action identifies as (tick one of the 4 following options):"}, {"bbox": [129, 669, 1140, 1348], "category": "Table", "text": "<table><tr><td colspan=\"3\"><strong>Action level (i.e. Budget Support, blending)</strong></td></tr><tr><td>☐</td><td>Single action</td><td>Present action: all contracts in the present action</td></tr><tr><td colspan=\"3\"><strong>Group of actions level (i.e. top-up cases, different phases of a single programme)</strong></td></tr><tr><td>☐</td><td>Group of actions</td><td>Actions reference (CRIS#/OPSYS#):</td></tr><tr><td colspan=\"3\"><strong>Contract level</strong></td></tr><tr><td>☒</td><td>Single Contract 1</td><td>Legal commitment / contract 1 relating to Specific objective 1 - cf. section 4.3.1.1 – indirect management</td></tr><tr><td>☒</td><td>Single Contract 2</td><td>Legal commitment / contract 2 relating to Specific objective 1 - cf. section 4.3.1.1 – indirect management</td></tr><tr><td>☒</td><td>Single Contract 3</td><td>Legal commitment / contract 3 relating to Specific objective 2 - cf. section 4.3.1 – direct management</td></tr><tr><td colspan=\"3\"><strong>Group of contracts level (i.e. series of programme estimates, cases in which an Action includes for example four contracts and two of them, a technical assistance contract and a contribution agreement, aim at the same objectives and complement each other)</strong></td></tr><tr><td>☐</td><td>Group of contracts 1</td><td></td></tr></table>"}, {"bbox": [1026, 1681, 1142, 1705], "category": "Page-footer", "text": "Page 30 of 30"}]