[{"bbox": [129, 153, 637, 191], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [129, 217, 1142, 300], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [129, 332, 1142, 388], "category": "Text", "text": "* Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance;"}, {"bbox": [129, 393, 1142, 449], "category": "Text", "text": "* Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations);"}, {"bbox": [129, 455, 936, 483], "category": "Text", "text": "* Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [129, 516, 1142, 572], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [129, 578, 1142, 631], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [129, 667, 658, 694], "category": "Text", "text": "The intervention level for the present Action identifies as:"}, {"bbox": [129, 731, 1140, 836], "category": "Table", "text": "<table><thead><tr><th colspan=\"3\">Option 1: Action level</th></tr></thead><tbody><tr><td>☒</td><td>Single action</td><td>Present action: all contracts in the present action</td></tr></tbody></table>"}, {"bbox": [1120, 1681, 1142, 1702], "category": "Page-footer", "text": "28"}]