[{"bbox": [114, 94, 1612, 1134], "category": "Table", "text": "<table><tr><td>Outcome 2</td><td>Improved ESCOM performance to provide quality and efficient electricity service.</td><td>2.1 System Minutes (SM)<br/>2.2 Customer Average Interruption Duration Index (CAIDI).<br/>2.3 Average Length of Power Outages (System Average Interruption Duration Index) (SAIDI).(Hours)<br/>2.4 Frequency of Power outages (System Average Interruption Frequency Index (SAIFI) (Index number)).<br/>2.5 Transmission losses</td><td>2.1 &gt; 8 min (2021)<br/>2.2 &gt;25 hours (2021)<br/>2.3 &gt;50 hours (2021)<br/>2.4 &gt;20 (2021)<br/>2.5 &gt;6% (2024)<br/>2.5 &gt;3% (2030)</td><td>2.1 &lt; 8 minutes (2030)<br/>2.2 &lt;25 hours (2030)<br/>2.3 &lt;50 hours (2030)<br/>2.4 &lt;10 (2030)<br/>2.5 &lt;3% (2030)</td><td>2.1-2.5 ESCOM reports</td><td>The Government of Malawi continues to support reforms in the energy sector.</td></tr><tr><td>Output 1 relating to Outcome 1</td><td>1.1 Upgraded and climate-resilient transmission power network serving the northern region.</td><td>1.1.1 Length of transmission lines constructed or upgraded with EU support. (Km)</td><td>1.1.1 0 km (2024)</td><td>1.1.1 293 km (2028)</td><td>1.1.1 Project reports.</td><td>New transmission line proves reliable and resilient to climate events.</td></tr><tr><td>Output 2 relating to Outcome 1</td><td>1.2 Increased capacity of grid system in the northern region.</td><td>1.2.1 Number of energy infrastructure systems and assets that have been upgraded, otherwise strengthened or relocated for enhanced resilience or reduced exposure to extreme climate events (direct impacts) and their consequences (e.g. peak demand of electricity for cooling systems during heatwaves).</td><td>1.2.1 0 (2024)</td><td>1.2.1 5 (1 power line, 4 substations) (2028)</td><td>1.2.1 Project reports.</td><td>Transmission line and substations are well maintained and operated efficiently.</td></tr><tr><td>Output 1 relating to Outcome 2</td><td>2.1 Improved technical design and development capacities of ESCOM.</td><td>2.1.1 Number of professionals/staff trained or coached disaggregated, whenever possible and relevant, by sex and age and by type of organisation.<br/>(Designing and analysing power transmission towers, and in substation design).</td><td>2.1.1 0 (2024)</td><td>2.1.1 10 (2028)</td><td>2.1.1 Project reports.</td><td>ESCOM is committed to delivering a high quality of service, energy efficiency and climate resilience.</td></tr><tr><td>Output 2 relating to Outcome 2</td><td>2.2 Improved operation and maintenance capacities of ESCOM.</td><td>2.2.1 Number of professionals/staff trained or coached disaggregated, whenever possible and relevant, by</td><td>2.2.1 0 (2024)</td><td>2.2.1 15 (2028)</td><td>2.2 Project reports.</td><td>ESCOM is committed to delivering a high quality of service,</td></tr></table>"}, {"bbox": [1493, 1149, 1614, 1174], "category": "Page-footer", "text": "Page 13 of 19"}]