[{"bbox": [146, 151, 495, 179], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [146, 189, 1084, 271], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [146, 281, 1084, 336], "category": "Text", "text": "- Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance;"}, {"bbox": [146, 347, 1084, 403], "category": "Text", "text": "- Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations);"}, {"bbox": [146, 413, 954, 441], "category": "Text", "text": "- Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [146, 451, 1084, 507], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [146, 517, 1084, 570], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [146, 583, 1012, 611], "category": "Text", "text": "The intervention level for the present Action identifies as (tick one of the 4 following options):"}, {"bbox": [146, 620, 1079, 1175], "category": "Picture"}, {"bbox": [965, 1681, 1080, 1705], "category": "Page-footer", "text": "Page 30 of 30"}]