[{"bbox": [114, 95, 1612, 1134], "category": "Table", "text": "<table><thead><tr><th>Results</th><th>Results chain (@):<br>Main expected results (maximum 10)</th><th>Indicators (@):<br>(at least one indicator per expected result)</th><th>Baselines<br>(values and years)</th><th>Targets<br>(values and years)</th><th>Sources of data</th><th>Assumptions</th></tr></thead><tbody><tr><td>Impact</td><td>To improve the quality of life and health of the populations of urban towns in PNG through increased access to safe, adequate and sustainable water supply services</td><td>1 Proportion of urban population having access to basic drinking water (JMP Indicator)</td><td>1 Realistic baseline for targeted urban towns will be confirmed during inception phase</td><td>1 Realistic targets, aligned with WASH policy will be formulated after baseline studies during the inception phase</td><td>1 District Development Agency (DDA) Annual Reports, Minister of Health/WHO,</td><td>Not applicable</td></tr><tr><td>Outcome 1</td><td>Improved capacity of Water PNG for water supply service delivery in selected urban towns in PNG.</td><td>1.1 Number of individual with access to safely managed drinking water services, disaggregated by sex and living area, with EU Support in target town(s),</td><td>1.1 Realistic baseline for targeted urban towns will be confirmed during inception phase</td><td>1.1 Realistic targets, aligned with WASH policy will be formulated after baseline studies during the inception phase</td><td>1.1 Project implementation report, Water PNG annual reports,</td><td>No major natural disaster affects the selected areas of implementation.<br>No population unrest; human security and safety remains manageable</td></tr><tr><td>Output 1<br>relating to Outcome 1</td><td>1.1 Improved technical capacity of WPNG for implementation and monitoring of sustainable water supply systems in the selected urban towns</td><td>1.1.1 Number of water supply system development plans developed<br>1.1.2 Number of water supply connections (disaggregated by type of building: households, business and service providers and location)</td><td>1.1.1 Realistic baseline for targeted urban towns will be confirmed during inception phase<br>1.1.2 Realistic baseline for targeted urban</td><td>1.1.1 Realistic targets, aligned with WASH policy will be formulated after baseline studies during the inception phase<br>1.1.2</td><td>1.1.1 Project implementation report, Household expenditure survey, Water PNG annual reports,<br>1.1.2 WaSH database, Annual reports</td><td>GoPNG continues to allocate sufficient resources towards the achievement of its WaSH sector policy objectives as prioritised in the Medium Term</td></tr></tbody></table>"}, {"bbox": [1494, 1149, 1614, 1174], "category": "Page-footer", "text": "Page 12 of 16"}]