[{"bbox": [146, 153, 651, 191], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [146, 218, 1080, 298], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [146, 309, 1080, 364], "category": "Text", "text": "Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance."}, {"bbox": [146, 375, 1080, 429], "category": "Text", "text": "Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e., audits, evaluations)."}, {"bbox": [146, 441, 953, 468], "category": "Text", "text": "Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [146, 480, 1080, 534], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [146, 546, 1080, 597], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [146, 650, 1012, 677], "category": "Text", "text": "The intervention level for the present Action identifies as (tick one of the 4 following options):"}, {"bbox": [146, 687, 1079, 1208], "category": "Table", "text": "<table><tr><td colspan=\"3\"><strong>Action level (i.e., Budget Support, blending)</strong></td></tr><tr><td><input type=\"checkbox\"/> Single action</td><td colspan=\"2\">Present action: all contracts in the present action</td></tr><tr><td colspan=\"3\"><strong>Group of actions level (i.e., top-up cases, different phases of a single programme)</strong></td></tr><tr><td><input type=\"checkbox\"/> Group of actions</td><td colspan=\"2\">Actions reference (CRIS#/OPSYS#):</td></tr><tr><td colspan=\"3\"><strong>Contract level</strong></td></tr><tr><td><input type=\"checkbox\" checked=\"checked\"/> Single Contract 1</td><td colspan=\"2\">Procurement PC 40190</td></tr><tr><td><input type=\"checkbox\" checked=\"checked\"/> Single Contract 2</td><td colspan=\"2\">Procurement PC 40191</td></tr><tr><td colspan=\"3\"><strong>Group of contracts level (i.e. series of programme estimates, cases in which an Action includes for example four contracts and two of them, a technical assistance contract and a contribution agreement, aim at the same objectives and complement each other)</strong></td></tr><tr><td><input type=\"checkbox\"/> Group of contracts 1</td><td colspan=\"2\"></td></tr></table>"}, {"bbox": [954, 1639, 1079, 1665], "category": "Page-footer", "text": "Page 21 of 21"}]