[{"bbox": [108, 151, 577, 186], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [108, 212, 1121, 295], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [108, 323, 1121, 380], "category": "Text", "text": "Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance;"}, {"bbox": [108, 406, 1121, 462], "category": "Text", "text": "Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations);"}, {"bbox": [108, 488, 919, 516], "category": "Text", "text": "Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [108, 542, 1121, 599], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [108, 624, 1121, 678], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [108, 706, 972, 734], "category": "Text", "text": "The intervention level for the present Action identifies as (tick one of the 4 following options):"}, {"bbox": [110, 738, 1119, 1271], "category": "Table", "text": "<table><tr><td colspan=\"3\"><strong>Action level (i.e., Budget Support, blending)</strong></td></tr><tr><td><input type=\"checkbox\"/></td><td>Single action</td><td>Present action: all contracts in the present action</td></tr><tr><td colspan=\"3\"><strong>Group of actions level (i.e., top-up cases, different phases of a single programme)</strong></td></tr><tr><td><input type=\"checkbox\"/></td><td>Group of actions</td><td>Actions reference (CRIS#/OPSYS#):</td></tr><tr><td colspan=\"3\"><strong>Contract level</strong></td></tr><tr><td><input type=\"checkbox\" checked/></td><td>Single Contract 1</td><td>Grant PC 40186</td></tr><tr><td><input type=\"checkbox\" checked/></td><td>Single Contract 2</td><td>Procurement PC 36833</td></tr><tr><td colspan=\"3\"><strong>Group of contracts level (i.e., series of programme estimates, cases in which an Action includes for example four contracts and two of them, a technical assistance contract and a contribution agreement, aim at the same objectives and complement each other)</strong></td></tr><tr><td><input type=\"checkbox\"/></td><td>Group of contracts 1</td><td></td></tr></table>"}, {"bbox": [990, 1653, 1121, 1681], "category": "Page-footer", "text": "Page 24 of 24"}]