[{"bbox": [85, 153, 591, 191], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [85, 217, 1126, 300], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [85, 340, 1122, 397], "category": "Text", "text": "- Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance;"}, {"bbox": [85, 401, 1104, 458], "category": "Text", "text": "- Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations);"}, {"bbox": [85, 463, 894, 490], "category": "Text", "text": "- Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [85, 528, 1087, 585], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [85, 590, 1116, 644], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [85, 684, 950, 712], "category": "Text", "text": "The intervention level for the present Action identifies as (tick one of the 4 following options):"}, {"bbox": [96, 724, 520, 752], "category": "Section-header", "text": "## Action level (i.e. Budget Support, blending)"}, {"bbox": [98, 769, 121, 796], "category": "Picture"}, {"bbox": [141, 769, 265, 796], "category": "Text", "text": "Single action"}, {"bbox": [349, 769, 1073, 796], "category": "Text", "text": "Present action: all contracts in the present action. OPSYS number: ACT-62023"}, {"bbox": [96, 827, 876, 856], "category": "Section-header", "text": "## Group of actions level (i.e. top-up cases, different phases of a single programme)"}, {"bbox": [98, 872, 121, 897], "category": "Picture"}, {"bbox": [141, 872, 297, 899], "category": "Text", "text": "Group of actions"}, {"bbox": [349, 872, 691, 899], "category": "Text", "text": "Actions reference (CRIS#/OPSYS#):"}, {"bbox": [96, 990, 237, 1014], "category": "Section-header", "text": "## Contract level"}, {"bbox": [98, 1040, 121, 1065], "category": "Picture"}, {"bbox": [141, 1040, 302, 1067], "category": "Text", "text": "Single Contract 1"}, {"bbox": [98, 1092, 121, 1117], "category": "Picture"}, {"bbox": [141, 1092, 302, 1119], "category": "Text", "text": "Single Contract 2"}, {"bbox": [141, 1141, 182, 1168], "category": "Text", "text": "(...)"}, {"bbox": [96, 1191, 1131, 1274], "category": "Section-header", "text": "## Group of contracts level (i.e. series of programme estimates, cases in which an Action includes for example four contracts and two of them, a technical assistance contract and a contribution agreement, aim at the same objectives and complement each other)"}, {"bbox": [98, 1290, 121, 1315], "category": "Picture"}, {"bbox": [141, 1290, 330, 1317], "category": "Text", "text": "Group of contracts 1"}, {"bbox": [1014, 1652, 1143, 1678], "category": "Page-footer", "text": "Page 16 of 16"}]