[{"bbox": [146, 152, 651, 191], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [146, 217, 1081, 299], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [146, 348, 1081, 403], "category": "Text", "text": "Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance;"}, {"bbox": [146, 413, 1081, 468], "category": "Text", "text": "Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations);"}, {"bbox": [146, 479, 954, 507], "category": "Text", "text": "Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [146, 557, 1081, 612], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [146, 622, 1081, 675], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [146, 728, 1012, 756], "category": "Text", "text": "The intervention level for the present Action identifies as (tick one of the 4 following options):"}, {"bbox": [146, 765, 1079, 1337], "category": "Table", "text": "<table><tr><td colspan=\"3\"><strong>Action level (i.e. Budget Support, blending)</strong></td></tr><tr><td><input type=\"checkbox\"/> Single action</td><td colspan=\"2\">Present action: all contracts in the present action</td></tr><tr><td colspan=\"3\"><strong>Group of actions level (i.e. top-up cases, different phases of a single programme)</strong></td></tr><tr><td><input type=\"checkbox\"/> Group of actions</td><td colspan=\"2\">Actions reference (CRIS#/OPSYS#):</td></tr><tr><td colspan=\"3\"><strong>Contract level</strong></td></tr><tr><td><input type=\"checkbox\" checked=\"true\"/> Single Contract 1</td><td colspan=\"2\">Support to Bolivia's national strategy on fight against illicit trafficking of drugs</td></tr><tr><td><input type=\"checkbox\" checked=\"true\"/> Single Contract 2</td><td colspan=\"2\">Support to GAFI recommendations to Bolivia</td></tr><tr><td><input type=\"checkbox\" checked=\"true\"/> Single Contract 3</td><td colspan=\"2\">Support to Justicia Libre</td></tr><tr><td colspan=\"3\"><strong>Group of contracts level (i.e. series of programme estimates, cases in which an Action includes for example four contracts and two of them, a technical assistance contract and a contribution agreement, aim at the same objectives and complement each other)</strong></td></tr><tr><td><input type=\"checkbox\"/> Group of contracts 1</td><td colspan=\"2\"></td></tr></table>"}, {"bbox": [954, 1654, 1081, 1681], "category": "Page-footer", "text": "Page 36 of 36"}]