[{"bbox": [125, 146, 1520, 1086], "category": "Table", "text": "<table><tr><td></td><td></td><td>professional and disadvantaged groups) with project support.</td><td></td><td></td><td>1.3.3<br>Intervention's<br>monitoring and<br>reporting system</td><td></td></tr><tr><td rowspan=\"2\">Output 2.1<br>relating to<br>Outcome 2</td><td rowspan=\"2\">New or upgraded,<br>transmission and distribution<br>infrastructure is installed and<br>operational</td><td>2.1.1 number of Constructed/<br>upgraded 132/33/11 kV substations,<br>switching stations and/ or transformer<br>stations by the project</td><td></td><td></td><td rowspan=\"2\">2.1.1<br>Intervention's<br>monitoring and<br>reporting system</td><td rowspan=\"2\"></td></tr><tr><td>2.1.2 more than 300 kilometres of 11<br>KV line and more than 50 kilometres<br>of 33 KV line will be constructed.</td><td></td><td></td></tr><tr><td></td><td></td><td>2.1.3 more than 5 substations<br>132/33/11 KV will be constructed or<br>upgraded by the project.</td><td>2.1.1.0</td><td>2.1.1 to be set after<br>the feasibility study</td><td></td><td></td></tr><tr><td></td><td></td><td>2.1.4 more than 5 control and dispatch<br>HV/MV facilities will be constructed/<br>upgraded by the project.</td><td>2.1.2.0</td><td>2.1.2 to be set after<br>the feasibility study</td><td>2.1.2<br>Intervention's<br>monitoring and<br>reporting system</td><td></td></tr><tr><td></td><td></td><td>2.1.5 reduction of losses at least by<br>20%, and supply outages by at least<br>20%.</td><td></td><td></td><td></td><td></td></tr><tr><td rowspan=\"2\">Output 2.2<br>relating to<br>Outcome 2</td><td rowspan=\"2\">Electricity supply from clean<br>energy sources for e-cooking,<br>e-transport, space and water<br>heating and cooling, and<br>export electricity rooftop<br>solar to grid in operation</td><td>2.2.1 grid capacity in the project area<br>(MW)</td><td></td><td></td><td rowspan=\"2\">2.2.1<br>Intervention's<br>monitoring and<br>reporting system,<br>events' and<br>activities'<br>attendance and<br>related reports</td><td rowspan=\"2\"></td></tr><tr><td>2.2.2 number of public and private<br>charging stations for e-vehicles<br>facilitated by the project</td><td>2.2.1. to be set<br>after the baseline<br>study</td><td>2.2.1 to be set after<br>the feasibility study</td></tr><tr><td></td><td></td><td>2.2.3 number of residential and public<br>building export of solar energy to the<br>grid</td><td>2.2.2.0</td><td>2.2.2 to be set after<br>the feasibility study</td><td>2.2.2 Intervention's<br>monitoring and<br>reporting system,<br>events' and<br>activities'<br>attendance and<br>related reports</td><td></td></tr></table>"}, {"bbox": [973, 1124, 1090, 1148], "category": "Page-footer", "text": "Page 17 of 22"}]