[{"bbox": [85, 120, 593, 159], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [85, 185, 1143, 268], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [85, 308, 1143, 365], "category": "Text", "text": "- Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance;"}, {"bbox": [85, 369, 1143, 426], "category": "Text", "text": "- Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations);"}, {"bbox": [85, 430, 894, 458], "category": "Text", "text": "- Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [85, 496, 1143, 553], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [85, 558, 1143, 612], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [85, 652, 950, 680], "category": "Text", "text": "The intervention level for the present Action identifies as (tick one of the 4 following options):"}, {"bbox": [85, 683, 1140, 789], "category": "Table", "text": "<table><thead><tr><th colspan=\"3\">Action level (i.e. Budget Support, blending)</th></tr></thead><tbody><tr><td>☑</td><td>Single action</td><td>Present action: all contracts in the present action</td></tr></tbody></table>"}, {"bbox": [1026, 1681, 1143, 1705], "category": "Page-footer", "text": "Page 29 of 30"}]