[{"bbox": [129, 153, 639, 191], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [129, 215, 1146, 303], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [129, 339, 1146, 398], "category": "Text", "text": "- Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance;"}, {"bbox": [129, 401, 1146, 460], "category": "Text", "text": "- Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations);"}, {"bbox": [129, 463, 1015, 493], "category": "Text", "text": "- Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [129, 529, 1146, 588], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [129, 591, 1146, 648], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [129, 686, 709, 715], "category": "Text", "text": "The intervention level for the present Action identifies as:"}, {"bbox": [129, 717, 1140, 820], "category": "Table", "text": "<table><thead><tr><th colspan=\"3\">Contract level</th></tr></thead><tbody><tr><td>☒</td><td>Single Contract 1</td><td>Three separate contribution agreements with pillar assessed entities.</td></tr></tbody></table>"}, {"bbox": [624, 1652, 650, 1676], "category": "Page-footer", "text": "34"}]