[{"bbox": [147, 151, 531, 182], "category": "Section-header", "text": "# Appendix 1 REPORTING IN OPSYS"}, {"bbox": [147, 192, 1085, 275], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [147, 284, 1085, 340], "category": "Text", "text": "Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance."}, {"bbox": [147, 349, 1085, 406], "category": "Text", "text": "Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations)."}, {"bbox": [147, 415, 957, 445], "category": "Text", "text": "Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [147, 454, 1085, 510], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [147, 519, 1085, 573], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [147, 586, 1015, 614], "category": "Text", "text": "The intervention level for the present Action identifies as (tick one of the 4 following options)."}, {"bbox": [147, 623, 1081, 727], "category": "Table", "text": "<table><thead><tr><th colspan=\"3\">Contract level</th></tr></thead><tbody><tr><td>☒</td><td>Single Contract 1</td><td>Contribution agreement with GIZ</td></tr></tbody></table>"}, {"bbox": [961, 1679, 1085, 1706], "category": "Page-footer", "text": "Page 29 of 29"}]