[{"bbox": [135, 242, 484, 270], "category": "Section-header", "text": "## Appendix 1 REPORTING IN OPSYS"}, {"bbox": [128, 286, 1142, 370], "category": "Text", "text": "A Primary Intervention (project/programme) is a coherent set of activities and results structured in a logical framework aiming at delivering development change or progress. Identifying the level of the primary intervention will allow for:"}, {"bbox": [128, 409, 1142, 466], "category": "Text", "text": "* Articulating Actions or Contracts according to an expected chain of results and therefore allowing them to ensure efficient monitoring and reporting of performance;"}, {"bbox": [128, 471, 1142, 528], "category": "Text", "text": "* Differentiating these Actions or Contracts from those that do not produce direct reportable development results, defined as support entities (i.e. audits, evaluations);"}, {"bbox": [128, 533, 937, 561], "category": "Text", "text": "* Having a complete and exhaustive mapping of all results-bearing Actions and Contracts."}, {"bbox": [128, 598, 1142, 655], "category": "Text", "text": "Primary Interventions are identified during the design of each action by the responsible service (Delegation or Headquarters operational Unit)."}, {"bbox": [128, 659, 1142, 714], "category": "Text", "text": "The level of the Primary Intervention chosen can be modified (directly in OPSYS) and the modification does not constitute an amendment of the action document."}, {"bbox": [128, 754, 658, 781], "category": "Text", "text": "The intervention level for the present Action identifies as:"}, {"bbox": [128, 784, 1140, 888], "category": "Table", "text": "<table><thead><tr><th colspan=\"3\">Contract level</th></tr></thead><tbody><tr><td><input type=\"checkbox\" checked/></td><td>Single Contract 1</td><td>All contracts in the present action</td></tr></tbody></table>"}, {"bbox": [1022, 1679, 1142, 1705], "category": "Page-footer", "text": "Page 29 of 29"}]