[{"bbox": [186, 150, 1035, 210], "category": "List-item", "text": "(7) Point 5.4.2 Indirect management with the partner country is replaced by the following:"}, {"bbox": [149, 225, 861, 254], "category": "Section-header", "text": "### 5.4.2 Indirect management with pillared assessed entity - UNOPS"}, {"bbox": [149, 267, 399, 295], "category": "Section-header", "text": "#### Action's Component 1:"}, {"bbox": [149, 307, 1136, 430], "category": "Text", "text": "SO1: To further upgrade the sewerage infrastructure of the Dutch Quarter district. The completion of the sewerage and drainage network in section 2 of the Dutch Quarter (and, budget permitting, any additional necessary area of the district) will contribute to enhanced community access to safe sanitation, in particular for residents living in the most vulnerable situations."}, {"bbox": [149, 445, 1136, 502], "category": "Text", "text": "Component 1 may be implemented in indirect management with the pillared assessed entity – UNOPS according to the following modalities:"}, {"bbox": [149, 515, 1073, 544], "category": "Text", "text": "The UNOPS will act as the contracting authority for the procurement and grant procedures."}, {"bbox": [149, 557, 589, 584], "category": "Text", "text": "Payments are executed by the Commission."}, {"bbox": [149, 597, 1136, 654], "category": "Text", "text": "UNOPS shall apply its own rules on procurement and grants. These rules will be laid down in the contribution agreement to be concluded with the UNOPS.'"}, {"bbox": [186, 711, 809, 740], "category": "List-item", "text": "(8) Point 5.6 Indicative budget is replaced by the following:"}, {"bbox": [149, 753, 1136, 812], "category": "Text", "text": "'The total cost is estimated at EUR 7,000,000¹⁰ to be financed by the EDF. The indicative budget sets out as follows:"}, {"bbox": [149, 830, 1103, 1216], "category": "Table", "text": "<table><thead><tr><th></th><th>EU contribution (amount in EUR)</th></tr></thead><tbody><tr><td>Objective/Outputs SO1/ O1 Indirect management with UNOPS - cf. section 5.4.2</td><td>5,600,000</td></tr><tr><td>Objective/Outputs SO2/ O2 Direct management - cf. section 5.4.1</td><td>880,000</td></tr><tr><td>Evaluation, (cf. section 5.9), Audit (cf. section 5.10) / Expenditure verification</td><td>60,000</td></tr><tr><td>Communication and visibility (cf. section 5.11)</td><td>20,000</td></tr><tr><td>Contingencies</td><td>440,000</td></tr><tr><td>Total</td><td>7,000,000</td></tr></tbody></table>"}, {"bbox": [149, 1381, 1136, 1503], "category": "Footnote", "text": "¹⁰ EU contribution for further upgrading of sewerage, drainage, and network system in the Dutch Quarter district (Component 1) is EUR 5.6 million, out of which sewer pipe-laying and underground household connection installing are the main outputs. Surface drainage will be combined with road improvement after the sewer pipe-laying is done (the cost normally doesn't exceed 10-15% of the road works). Detailed budget breakdown will be provided in the TAPs."}, {"bbox": [636, 1525, 650, 1545], "category": "Page-footer", "text": "5"}]