[{"bbox": [71, 98, 1690, 1119], "category": "Table", "text": "<table><tr><td></td><td></td><td>4 Extension and reinforcement of the grid for transporting more electricity (TWh)<br/>5 Proportion (%) of the population (disaggregated by sex and disabilities whenever possible) with access to clean cooking (* MIP, ** GERF 1.2 SDG 7.1)</td><td></td><td></td><td></td><td></td></tr><tr><td rowspan=\"3\">Outcome 1</td><td rowspan=\"3\">1 Increased production of electricity from renewable energy in the Centre of the country</td><td>1.1 Generation Renewable energy (GWh per year) on average</td><td></td><td></td><td></td><td></td></tr><tr><td>1.2 Greenhouse Gas emissions avoided (tonnes CO2 eq) with EU support (*-MIP) (**GERF 2.7)</td><td>1.1 =0 (2024)</td><td>1.1= 257 (2030)</td><td rowspan=\"2\">1.2 EDM annual report<br/>1.3 EDM annual report, EIB calculation<br/>1.4 EDM annual report</td><td rowspan=\"3\">Government of Mozambique continues to support activities to reach goal of universal access to energy by 2030</td></tr><tr><td>1.3 System Average Interruption Duration Index (SAIDI), measured in number of hours per year: Centre</td><td>1.2=0(2024)</td><td>1.2= (2030)</td></tr><tr><td></td><td></td><td>1.3= 35:36 (2022)</td><td>1.3= TBD (2030)</td><td></td><td></td></tr><tr><td rowspan=\"3\">Outcome 2</td><td rowspan=\"3\">2 Increased, improved and inclusive access to affordable, reliable, sustainable, and modern energy in the Nampula and Inhambe Provinces of the country</td><td>2.1 Number of people (disaggregated by sex and disabilities whenever possible) with access to electricity with EU support through: (b) improved access (*MIP) (** GERF 2.3) in Nampula and Inhambe Provinces</td><td>2.1 =0</td><td>2.1= 350,000 (Angoche District)</td><td rowspan=\"2\">2.1 EDM annual report<br/>2.2 EDM annual report</td><td rowspan=\"3\">Energy transition strategy continues to be a priority for the Government of Mozambique<br/>EDM gender strategy is implemented</td></tr><tr><td>2.2 System Average Interruption Duration Index (SAIDI), measured in total number of outage hours per year: Nampula and Inhambe Provinces</td><td>2.2= NC 72:33, NO 81:17</td><td>325,000 (Massinga and Vilanculos districts)</td></tr><tr><td></td><td>2.3 = 19% (2021)</td><td>2.2= TBD<br/>2.3 =40% (2030)</td><td></td><td></td></tr></table>"}, {"bbox": [1568, 1134, 1690, 1158], "category": "Page-footer", "text": "Page 19 of 33"}]