[{"bbox": [71, 98, 1690, 1134], "category": "Table", "text": "<table><tr><td></td><td></td><td>4.3 Renewable energy generation capacity installed (MW) with EU support (* MIP) (** GERF 2.4)<br/>4.4 Greenhouse Gas emissions avoided (tonnes CO2 eq per year) with EU support (*-MIP) (**GERF 2.7)</td><td></td><td></td><td>client databases, cross-checks between companies.</td><td></td></tr><tr><td>Output 1<br/>relating to<br/>Outcome 1</td><td>1.1 Increased power generation capacity from renewable energy through the construction of the Tsate hydropower plant on the Revué river</td><td>1<br/>1.1.1. Renewable energy (hydropower) generation capacity installed (MW) with EU support (* MIP) (** GERF 2.4)<br/>1.1.2 Status of connection of Tsate HPP to the Mavuzi-Chibata transmission line</td><td>1.1.1=0 (2024)<br/>1.1.2 not connected (2024)</td><td>1.1.1=50 (2033)<br/>1.1.2 connected (2033)</td><td>1.1.1 Owner Engineer supervision report, completion and acceptance certificates<br/>1.1.2 Owner Engineer supervision report on connection to the grid</td><td>EDM has sufficient capacities for operation and maintenance of the Tsate HPP</td></tr><tr><td>Output 1<br/>relating to<br/>Outcome 2</td><td>2.1 The transmission line (220kV) between Nampula and Angoche (Nampula Province) is built</td><td>2.1.1 Number of electricity substations expanded and upgraded, Nampula Province<br/>2.1.2 Km length of transmission lines built, Nampula Province</td><td>2.1.1=0 (2024)<br/>2.1.2 =0 (2024)</td><td>2.1.1=2 (2030)<br/>2.1.2=145 (2030)</td><td>2.1.1 Owner Engineer supervision report, completion and acceptance certificates<br/>2.1.2 Owner Engineer supervision report, completion and acceptance certificates</td><td>The transmission line are operated and maintained by EDM, which have sufficient capacities for that</td></tr><tr><td>Output 2<br/>relating to<br/>Outcome 2</td><td>2.2 The transmission line (110kV) between Massinga and Vilanculos (Inhambane Province) is built</td><td>2.2.1 Number of electricity substation are expanded and upgraded, Inhambe Province<br/>2.2.2 Km length of transmission lines built, Inhambe Province</td><td>2.2.1 =0 (2024)<br/>2.2.2 =0 (2024)</td><td>2.2.1=3 (2030)<br/>2.2.2=200 (2030)</td><td>2.2.1 Owner Engineer supervision report, completion and acceptance certificates<br/>2.2.2 Owner Engineer supervision report, completion and acceptance certificates</td><td>The transmission line are operated and maintained by EDM, which have sufficient capacities for that</td></tr><tr><td>Output 1<br/>relating to<br/>Outcome 3</td><td>3.1 Improved and resilient to climate change energy infrastructure through rehabilitation of the grid in the Northern part of Cabo Delgado Province</td><td>3.1.1 Number of electricity substations rehabilitated in North of Cabo Delgado</td><td>3.1.1=0 (2024)</td><td>3.1.1=2 (2030)<br/>3.1.2 =600 (2030)<br/>3.1.3 =5 (2030)</td><td>3.1.1 Owner Engineer supervision report, completion and acceptance certificates</td><td>The infrastructure is operated and maintained by EDM, which have sufficient capacities for that</td></tr></table>"}, {"bbox": [1568, 1135, 1690, 1158], "category": "Page-footer", "text": "Page 21 of 33"}]