[{"bbox": [71, 98, 1689, 1120], "category": "Table", "text": "<table><tr><td></td><td></td><td>3.1.2 Km length of distribution lines built in the North of Cabo Delgado</td><td>3.1.2 =0 (2024)</td><td></td><td>3.1.2 Owner Engineer supervision report, completion and acceptance certificates</td><td>sufficient capacities for that</td></tr><tr><td></td><td></td><td>3.1.3 Number of new administrative posts connected to the grid</td><td>3.1.3 =0 (2024)</td><td></td><td>3.1.3 Owner Engineer supervision report, completion and acceptance certificates</td><td></td></tr><tr><td rowspan=\"3\">Output 1<br/>relating to<br/>Outcome 4</td><td rowspan=\"3\">4.1 Improved capacities of relevant stakeholders for Energy sector governance, planning, procurement, and regulation for a low emission power system transformation</td><td>4.1.1 Number of power system expansion planning processes and products enhanced</td><td>4.1.1 =0 (2024)</td><td>4.1.1 =2 (2030)</td><td>4.1.1 Technical submissions of GET transform and its partners (e.g. energy planning diagnostics, energy modelling, scenario development, delivery and implementation of Energy Transition processes, enhancing institutional arrangement and governance).</td><td>Mozambique remains committed to the achievement of power sector goals and allocate resources to the promotion of sustainable energy systems;</td></tr><tr><td>4.1.2 Number of draft technical power system planning and operating procedures for integrating renewable energy enhanced 4.1.3 Number of studies and draft regulations that have advanced regulation, market reforms and the enabling framework for electricity access</td><td>4.1.2 =0 (2024)</td><td>4.1.2 =2 (2030)</td><td>4.1.2 Technical submissions of GET transform and its partners (e.g. grid integration roadmaps and standards, flexibility and stability studies, grid codes, enhanced power sector transformation processes)</td><td>Public sector partners are willing and have capacities to embark on comprehensive energy sector transformation processes and allocate resources to the promotion of sustainable energy systems;</td></tr><tr><td></td><td>4.1.3 =0 (2024)</td><td>4.1.3 =6 (2030)</td><td>4.1.3 Submission of contributions by GET transform and its partners (e.g. regulatory design for IPP and distributed generation, IPP tendering mechanism, de-risking of on-grid segment international experience,</td><td>Institutional framework conditions are not negatively affected by e.g. political conflicts, external shocks etc. in processing resulting products in due time;</td></tr></table>"}, {"bbox": [1568, 1134, 1690, 1158], "category": "Page-footer", "text": "Page 22 of 33"}]