[{"bbox": [129, 152, 1078, 191], "category": "Section-header", "text": "# Appendix 1 – Selection of “Primary Intervention Reporting” in OPSYS"}, {"bbox": [129, 217, 1044, 245], "category": "Text", "text": "This Appendix must **not be attached** to the draft Commission Decision, as indicated in Appendix 2."}, {"bbox": [129, 262, 1142, 345], "category": "Text", "text": "Appendix 1 serves the purpose to **define/select the correct level of “Primary Intervention Reporting”** to be made in the system OPSYS, and in particular in the ‘synopsis’ tab related to the action (ACT) corresponding to the Decision."}, {"bbox": [129, 365, 1142, 478], "category": "Text", "text": "The primary intervention (PINTV) refers to the development results presented along the structure of a logical framework matrix (logframe) and that will be monitored during implementation. The same PINTV could be linked to one or more legal commitments. Accordingly, it is necessary to make the most relevant choice among the options provided by the system and presented in the table below."}, {"bbox": [129, 492, 1142, 547], "category": "Text", "text": "More information on the definition of primary intervention can be found in the wiki [Results & Monitoring - Interventions](#)."}, {"bbox": [129, 575, 1142, 659], "category": "Text", "text": "The examples provided below do not cover all possible cases and options provided by the system OPSYS. For additional support in the choice of the most suitable option, please contact the FMB: [INTPA-AD-RESULTS@ec.europa.eu](mailto:INTPA-AD-RESULTS@ec.europa.eu)."}, {"bbox": [130, 728, 1096, 1421], "category": "Table", "text": "<table><tr><td colspan=\"2\">The “Primary Intervention Reporting” choice to be made is (please tick <strong>one</strong> box, and do not remove other choices):</td></tr><tr><td><input type=\"checkbox\" checked disabled></td><td><strong>Option 1: Contract(s) level</strong><br/>Select this option when the contract(s) (CL2) related to this Decision is (are) likely to have its (their) own logframe that will be regularly reported on by the implementing partner.<br/>Examples:<br/>- A Decision that includes more than one implementation modalities (i.e. direct and indirect management combined with type of financing: budget support, grant, public procurement, financial instruments)<br/>- A Decision in which the implementation modality chosen is: direct management (mode) and grant (type of financing). Following a call for proposals, one or more grants will be awarded. Hence each grant contract will have its own logframe and therefore its dedicated PINTV</td></tr><tr><td><input type=\"checkbox\" disabled></td><td><strong>Option 2: Group of contracts</strong><br/>Select this option if two or more contracts derived from this Decision share the same logframe or if one or more contracts derived from this Decision contribute to the logframe of an existing intervention (as long as they are funded under the same financial instrument).<br/>It is not possible to group contracts funded via EDF and NDICI.<br/>Example:<br/>The Decision includes one contract that is a top up to an existing contract funded by another Decision, but belonging to the same financial instrument (i.e. NDICI).</td></tr></table>"}, {"bbox": [1026, 1681, 1142, 1705], "category": "Page-footer", "text": "Page 29 of 29"}]