|
|
--- |
|
|
tags: |
|
|
- EU |
|
|
- Electricity |
|
|
- price |
|
|
- model |
|
|
- dataset |
|
|
--- |
|
|
AC – Actual Consumption |
|
|
|
|
|
Meaning: Measured electricity consumption/load on the grid. |
|
|
|
|
|
Data: Quarter-hourly values of total grid load, residual load, and other consumption-related metrics. |
|
|
|
|
|
AG – Actual Generation |
|
|
|
|
|
Meaning: Measured (real-time) electricity generation by source. |
|
|
|
|
|
Data: Quarter-hourly values for biomass, hydropower, wind (onshore/offshore), photovoltaics, nuclear, coal, gas, etc. |
|
|
|
|
|
AFRR – Automatic Frequency Restoration Reserve |
|
|
|
|
|
Meaning: Balancing reserve activated automatically to stabilize system frequency. |
|
|
|
|
|
Data: Quarter-hourly volumes activated (+/−), procurement prices, and volumes procured. |
|
|
|
|
|
BE – Balancing Energy |
|
|
|
|
|
Meaning: Energy used by TSOs to balance the power system in real-time. |
|
|
|
|
|
Data: May include volumes (MWh) and costs (€/MWh) of balancing energy activated from various sources. |
|
|
|
|
|
CBPF – Cross-Border Physical Flows |
|
|
|
|
|
Meaning: Actual physical electricity flows across national borders. |
|
|
|
|
|
Data: Quarter-hourly measurements of imports/exports (in MWh) with neighboring countries. |
|
|
|
|
|
EBS – Exported Balancing Services |
|
|
|
|
|
Meaning: Balancing services provided by one country’s TSO to another country’s TSO. |
|
|
|
|
|
Data: Quarter-hourly or aggregated volumes (MWh) of balancing energy exported, and possibly associated costs. |
|
|
|
|
|
FC – Forecasted Consumption |
|
|
|
|
|
Meaning: Projected or estimated electricity consumption/load. |
|
|
|
|
|
Data: Often day-ahead or short-term quarter-hourly forecasts of total grid load, residual load, etc. |
|
|
|
|
|
FGDA – Forecasted Generation Day-Ahead |
|
|
|
|
|
Meaning: Predicted generation by source for the next day (day-ahead). |
|
|
|
|
|
Data: Hourly or quarter-hourly forecasted generation volumes for wind, solar, etc. |
|
|
|
|
|
FCR – Frequency Containment Reserve |
|
|
|
|
|
Meaning: Reserve capacity that automatically responds to frequency deviations (primary control). |
|
|
|
|
|
Data: Procurement prices (€/MW), volumes procured, and activation data at quarter-hourly resolution. |
|
|
|
|
|
GFI – Generation Forecast Intraday |
|
|
|
|
|
Meaning: Intraday (within the same day) updates to the generation forecast. |
|
|
|
|
|
Data: Quarter-hourly predicted generation volumes by technology, updated more frequently than day-ahead forecasts. |
|
|
|
|
|
IBS – Imported Balancing Services |
|
|
|
|
|
Meaning: Balancing services a TSO imports from neighboring countries’ TSOs. |
|
|
|
|
|
Data: Quarter-hourly volumes (MWh) of balancing services imported and related costs. |
|
|
|
|
|
MFRR – Manual Frequency Restoration Reserve |
|
|
|
|
|
Meaning: Manually activated reserve used by TSOs to restore frequency and manage imbalances. |
|
|
|
|
|
Data: Quarter-hourly volumes of capacity procured, volumes activated, and procurement prices. |
|
|
|
|
|
SCE – Scheduled Commercial Exchanges |
|
|
|
|
|
Meaning: Planned or scheduled cross-border electricity trades (as opposed to actual physical flows). |
|
|
|
|
|
Data: Quarter-hourly net exports/imports (MWh) based on market schedules. |
|
|
|
|
|
Prices (Originally “Day-ahead Prices”) |
|
|
|
|
|
Meaning: Market-clearing electricity prices, typically from the day-ahead market. |
|
|
|
|
|
Data: Hourly prices (€/MWh) for Germany/Luxembourg and neighboring bidding zones. |
|
|
|
|
|
TSOs (Originally “Costs_of_TSOs_without_costs_of_DSOs”) |
|
|
|
|
|
Meaning: Various costs and expenditures related to Transmission System Operators (TSOs). |
|
|
|
|
|
Data: Monthly or quarterly cost data for network security, countertrading, balancing services, etc. |
|
|
|
|
|
Gen_Capacity (Originally “Installed Generation Capacity”) |
|
|
|
|
|
Meaning: Total installed power generation capacity by technology. |
|
|
|
|
|
Data: Typically annual (sometimes monthly) capacity values (MW) for biomass, wind, solar, nuclear, coal, gas, and other generation sources. |