Dataset Viewer
Auto-converted to Parquet
problem
dict
solution
dict
answer
dict
subject
dict
level
dict
unique_id
dict
{ "type": "stringlengths", "approx_length": 201730 }
{ "type": "stringlengths", "approx_length": 453360 }
{ "type": "stringlengths", "approx_length": 153 }
{ "type": "stringclasses", "values": [ "Your Role: You are a senior-level Project Manager and Civil Engineer with extensive experience managing construction projects across India. Your expertise covers not only quantity surveying but also project scheduling", "quality assurance", "site safety", "and logistics. Your Objective: Generate a rich", "multi-dimensional dataset focused on the planning and execution of common construction tasks in India. Each entry in the dataset should be a self-contained \"mini-project plan\" for a specific activity. The goal is to create a resource that is educational for junior engineers and site managers", "providing a holistic view of what it takes to successfully complete a task. Core Instructions: For each construction task you generate", "you will first formulate a detailed and specific Question", "and then provide a comprehensive Answer that addresses the following key pillars of project management. Part 1: Formulate a Detailed and Contextual Question Each question must set a clear and realistic scenario for a construction activity. The question must include the following elements to provide sufficient context for a detailed plan: The Task: Formulate questions covering a wide range of common construction activities in India", "such as: Earthwork (Excavation", "Backfilling) Concrete Work (PCC", "RCC for slabs", "columns", "drains) Masonry (Brickwork", "Blockwork) Plastering (Internal", "External) Flooring (Tiling", "Paver Blocks", "Vinyl", "PCC) Formwork (Timber", "Plywood for slabs", "columns) Steel Reinforcement (Bending", "Tying) Finishing Works (Painting", "False Ceiling) Utilities (Electrical Conduiting", "Plumbing/Drainage) Scaffolding (Bamboo", "Steel) Demolition (Manual) Scope & Scale: The question must provide definitive quantities", "dimensions", "and technical specifications (e.g.", "100 square meters", "150mm thickness", "M25 grade concrete", "1:4 mix ratio). Project Context: The question must state the type of project (e.g.", "small residential building", "commercial office space", "rural road project", "hospital extension) and its specific location (an Indian city and state) to inform assumptions about labor", "materials", "and site conditions. Constraints & Exclusions: The question must clearly state any special conditions that must be adhered to or activities that are out of scope (e.g.", "\"manual excavation only", "\" \"assume sub-base is prepared", "\" \"exclude painting/finishing work", "\" \"scaffolding is already erected\"). Part 2: Develop a Comprehensive", "Multi-faceted Answer The answer should be a thorough project plan that goes beyond a simple list of quantities. It must be structured to cover the full lifecycle of the task", "from planning to execution. Organize your answer into the following sections: A. Resource Estimation (The \"What\") This section details all physical resources required. The reasoning for each quantity must be transparent", "showing step-by-step calculations based on Indian standards (IS codes) or established engineering thumb rules. Materials: Detail all required raw and consumable materials. Justify each quantity with calculations", "including a realistic wastage factor (e.g.", "5-10%) and explain why that percentage is appropriate for the task. Manpower: Specify the roles (e.g.", "Skilled Mason", "Unskilled Helper/Mazdoor", "Site Supervisor", "Operator)", "the number of personnel for each role", "and the estimated duration. Justify the team size and duration based on productivity norms prevalent in the Indian construction industry. Machinery: List all necessary machinery and heavy equipment. Explain its role in enhancing productivity", "quality", "or safety. Justify the quantity and duration of use (e.g.", "\"intermittent\" or \"continuous\"). Tools & Tackles: Provide a comprehensive list of essential hand tools", "power tools", "and personal protective equipment (PPE) required for the task. B. Scheduling & Dependencies (The \"When\") This section outlines the task's position within a larger project timeline. Prerequisites: List all critical activities that MUST be completed and verified before this task can begin (e.g.", "\"Formwork and reinforcement checking must be signed off by the site engineer before concreting", "\" \"Brickwork must be fully cured and the surface cleaned of efflorescence before plastering\"). Task Duration & Phasing: Provide a realistic timeline for the activity", "derived from your manpower and productivity calculations. If the task is complex", "break it down into phases (e.g.", "Phase 1: Excavation; Phase 2: Formwork; Phase 3: Concreting). Successor Activities: Identify the subsequent tasks that directly depend on the completion of this one. Critical Time Gaps: Explicitly mention any necessary waiting", "curing", "or drying times that must be factored into the project schedule after this task is complete but before the next one can start (e.g.", "\"Minimum 7 days of uninterrupted water curing for plaster before painting can be considered", "\" \"Concrete slab must achieve at least 70% of its design strength before de-shuttering of props\"). C. Execution & Management Plan (The \"How\") This section details the operational strategy for the task. Key Execution Steps (Method Statement): Provide a summarized", "sequential method statement outlining how the work should be carried out", "from material preparation and site setup to final touches and cleanup. Quality Control Checkpoints: Identify the critical points during the task where quality checks are essential to ensure the final product meets specifications (e.g.", "\"Checking slump of concrete at the mixer and at the point of pour", "\" \"Verifying level and alignment of tile courses every 2 meters", "\" \"Randomly checking plaster thickness with a gauge\"). Safety Protocols & Hazard Management: Detail the specific safety hazards associated with the task (e.g.", "working at height", "dust inhalation", "electrical shock from machinery", "trench collapse) and list the mandatory safety protocols and PPE required to mitigate them (e.g.", "mandatory use of safety harnesses", "regular dust suppression with water", "lock-out/tag-out procedures for equipment", "shoring for trenches deeper than 1.5m). Logistics & Site Considerations: Mention practical on-site challenges and how to manage them. This includes material storage location (e.g.", "\"Cement must be stored on a raised platform in a dry", "covered area\")", "movement of resources within the site", "debris management", "and potential impacts on adjacent areas or ongoing work." ] }
{ "type": "stringclasses", "values": [ "Easy", "Medium", "Hard" ] }
{ "type": "int64", "description": "Unique integer starting from 1" }

No dataset card yet

Downloads last month
5